PDCA

  • PDCA
  • PDCA
  • PDCA
  • PDCA

Detailed App Info:

  • Last Changed:Time:
  • Current Version:Version: 1.0
  • Device Type:Device: iPhone Ready
  • Category:Category: Business
  • iTunes Seller:Seller:
  • Download Size:App Size: 771.46 KB

Application Description

Twitter:
Google:
Facebook:
PDCA (plan–do–check–act) is an iterative four-step management method used in business for the control and continuous improvement of processes and products. It is also known as the Deming circle/cycle/wheel,Shewhart cycle, control circle/cycle, or plan–do–study–act (PDSA).
The steps in each successive PDCA cycle are :
PLAN
Establish the objectives and processes necessary to deliver results in accordance with the expected output (the target or goals). By establishing output expectations, the completeness and accuracy of the specification is also a part of the targeted improvement. When possible start on a small scale to test possible effects.
DO 
Implement the plan, execute the process, make the product. Collect data for charting and analysis in the following "CHECK" and "ACT" steps.
CHECK 
Study the actual results (measured and collected in "DO" above) and compare against the expected results (targets or goals from the "PLAN") to ascertain any differences. Charting data can make this much easier to see trends over several PDCA cycles and in order to convert the collected data into information. Information is what you need for the next step "ACT".
ACT 
Request corrective actions on significant differences between actual and planned results. Analyze the differences to determine their root causes. Determine where to apply changes that will include improvement of the process or product. When a pass through these four steps does not result in the need to improve, the scope to which PDCA is applied may be refined to plan and improve with more detail in the next iteration of the cycle.

Hit a Text Box to enter plans/activities/observations/tasks.Hit the title to give a name to the PDCA cycle.Hit menu > hit save to save the details.

PDCA should be repeatedly implemented in spirals of increasing knowledge of the system that converge on the ultimate goal, each cycle closer than the previous. One can envision an open coil spring, with each loop being one cycle of the scientific method - PDCA, and each complete cycle indicating an increase in our knowledge of the system under study. This approach is based on the belief that our knowledge and skills are limited, but improving. Especially at the start of a project, key information may not be known; the PDCA—scientific method—provides feedback to justify our guesses (hypotheses) and increase our knowledge. Rather than enter "analysis paralysis" to get it perfect the first time, it is better to be approximately right than exactly wrong. With the improved knowledge, we may choose to refine or alter the goal (ideal state). Certainly, the PDCA approach can bring us closer to whatever goal we choose.
Rate of change, that is, rate of improvement, is a key competitive factor in today's world. PDCA allows for major 'jumps' in performance ('breakthroughs' often desired in a Western approach), as well as Kaizen (frequent small improvements). In the United States a PDCA approach is usually associated with a sizable project involving numerous people's time, and thus managers want to see large 'breakthrough' improvements to justify the effort expended. However, the scientific method and PDCA apply to all sorts of projects and improvement activities.
Note:Background color changes Everyday(total 7 colors).

Requirements

Your mobile device must have at least 771.46 KB of space to download and install PDCA app. PDCA is available on iTunes for $2.99

If you have any problems with installation or in-app purchase, found bugs, questions, comments about this application, you can visit the official website of K KALEESWARAN at http://sites.google.com/site/kalees36.

Copyright © 2012 K Kaleeswaran